Day 15 and 16 – Siding, siding, siding

Day 15 marked the beginning of our 3rd week of renovation. Paul and Amber spent most of Days 15 & 16 finishing up the siding work around the front kitchen window. Lots of noise. By the end of the second day the siding was in place waiting to be re-stained. That is a job for yet another contractor. I made that call today hoping to get on their schedule.

Gastón did not come today so the sheetrock work is at a standstill. Nothing has changed inside the house. There are fewer boxes of cabinets sitting around in the living room. The microwave arrived today to take up some of the recently vacated floor space.

This entry was posted in Renovation is NOT for sissies!. Bookmark the permalink.